All Issue

2020 Vol.33, Issue 1 Preview Page

Research Paper

29 February 2020. pp. 35-44
Abstract
References
1
An, J.W., Yun, S.H. (2017) Improvement of BoQ Documents for the BIM based Quantity Takeoff, J. KIBIM, 7(2), pp.16~24.
2
Choi, H.C. Lee, Y.J., Lee, S.E., Kim, C.K. (2014) Development of 3-Dimensional Rebar Detail Design and Placing Drawing System, J. Comput. Struct. Eng, Inst, Korea, 27(4), pp.289~296.
10.7734/COSEIK.2014.27.4.289
3
Chung, S.W., Kwon, S.W. (2014) Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project, J. Constr. Eng. & Manag., 15(2), pp.53~61.
10.6106/KJCEM.2014.15.2.053
4
Joo, S.U., Kim, C.K. Kim, S.U., Noh, J.O. (2017) BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Rainforced Concrete Structures, J. Comut. Struct. Eng, Inst, Korea, 30(6), pp.567~576.
10.7734/COSEIK.2017.30.6.567
5
Jun, K.H., Yun, S.H. (2011) The Case Study of BIM-based Quantity Take-off for Concrete and Formwork, J. KIBIM, 1(1), pp.13~17.
6
Kim, J.H., Yoon, S.W. (2013) A Verification of the Accuracy in BIM-based Quantity Taking-Off Focusing on Finishing Work, J. KIBIM, 3(2), pp.1~9.
10.13161/kibim.2013.3.2.001
7
Kim, T.H., Hong, C.G., Kim, S.K. (2003) Algorithm for the Reinforced Concrete Framework Materials Take-off, J. Constr. Eng. & Proj. Manag., 4(1), pp.114~121.
8
Kim, Y.J., Kim, S.A., Chin, S.Y. (2012) A Study of BIM based Estimation Modeling Data Reliability Improvement, J. Constr. Eng. & Manag., 3(3), pp.43~55.
10.6106/KJCEM.2012.13.3.043
9
Kwon, O.C., Jo, C.W., Cho, J.W. (2011) Introduction of BIM Quality Standard for Quantity Take-off, J. Korea Inst. Build. Constr., 11(2), pp.171~180.
10.5345/JKIC.2011.04.2.171
10
Min, K.H., Kim, S.J. (2016) Comparison Analysis of Concrete Material Take-off of Structural Frame Work Based on BIM, J. Constr. Eng. & Manag., 2016-11, pp.112~115.
11
Park, Y.J., Won, S.K., Han, C.H., Lee, J.B. (2011) A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects, J. Archi. Inst. Korea, 27(6), pp.123~130.
12
Shin, J.C., Ahn, S.R. (2013) Analysis of Errors and Reliability in Earth-Volume and Retaining wall Quantity Estimations with 3D-BIM Compared with Routine Method Based 2D, J. KIBIM, 3(1), pp.25~26.
13
Song, C.H., Kim, C.K., Lee, S.E., Choi, H.C. (2016) Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase, J. Comput. Struct. Eng, Inst, Korea, 29(5), pp.447~454.
10.7734/COSEIK.2016.29.5.447
14
Yoo, J.E., Lee, C.S. (2015) Comparison of Quantity Take-off based on BIM and 2D, J. Constr. Eng. & Manag., 2015-11, pp.127~130.
15
Yoon, M.C. (2013) A BIM-Based Architectural Model Takes Advantage of the Estimate Model Process, J. Archi. Inst. Korea, 29(9), pp.95~102.
Information
  • Publisher :Computational Structural Engineering Institute of Korea
  • Publisher(Ko) :한국전산구조공학회
  • Journal Title :Journal of the Computational Structural Engineering Institute of Korea
  • Journal Title(Ko) :한국전산구조공학회 논문집
  • Volume : 33
  • No :1
  • Pages :35-44
  • Received Date : 2019-10-01
  • Revised Date : 2019-10-08
  • Accepted Date : 2019-11-19
Journal Informaiton Journal of the Computational Structural Engineering Institute of Korea Journal of the Computational Structural Engineering Institute of Korea
  • NRF
  • KOFST
  • crossref crossmark
  • crossref cited-by
  • crosscheck
  • orcid
  • open access
  • ccl
Journal Informaiton Journal Informaiton - close