Abstract
References
Information
References
YS Cho, MR Kim and SC Hong, J. Archit. Inst. Korea Struct.& Constr, A Study on Automatic Reinforcement Placement System of Isolated Foundation based on S-BIM , 29(11); 21-28 (2013)
HC Choi, YJ Lee, SE Lee and CK Kim, J. Comput. Struct. Eng. Inst. Korea, Development of 3-Dimensional Rebar Detail Design and Placing Drawing System , 27(4); 289-296 (2014)
10.7734/COSEIK.2014.27.4.289JE Eom, JH Lee, JH Kim and IS Choi, J. Comput. Struct. Eng. Inst. Korea, An Introduction to a BIM-based Automated Reinforcement Modeling System , 27(3) (2014)
SU Hong, YS Cho, JH Lee and SC Hong, J. Archi. Inst. Korea Struct. & Constr, The Study on Development of Automatic Reinforcement Placing System of Columns for RC Structures based on Parametric Technology , 27(1); 11-18 (2011)
JW Jang, The Development of a Rebar Arrangement System for Reinforced Concrete by Applying the Structural BIM-based Lean Design Technique, Master’s Thesis, Graduate School of Hanyang University. (2013)
- Publisher :Computational Structural Engineering Institute of Korea
- Publisher(Ko) :한국전산구조공학회
- Journal Title :Journal of the Computational Structural Engineering Institute of Korea
- Journal Title(Ko) :한국전산구조공학회 논문집
- Volume : 29
- No :5
- Pages :447-454
- Received Date : 2016-08-05
- Revised Date : 2016-08-31
- Accepted Date : 2016-09-01
- DOI :https://doi.org/10.7734/COSEIK.2016.29.5.447


Journal of the Computational Structural Engineering Institute of Korea







