All Issue

2022 Vol.35, Issue 4

Research Paper

31 August 2022. pp. 197-205
Abstract
References
1
Baek, D.H., Park, J.R., Kim, J.H., Kim, J.J. (2011) A Basic Study of the Efficiency Analysis for the Amount of Calculation Earth Works Using by BIM, Korean Institute of Building Construction Conference, pp.97~98.
2
Bartier, P.M., Keller, C.P. (1996) Multivariate Interpolation to Incorporate Thematic Surface Data using Inverse Distance Weighting (IDW), Comput. & Geosci., 22(7), pp.795~799. 10.1016/0098-3004(96)00021-0
3
Han, J.H., Nam, S.H. (2011) A Study on the Automated Estimating System using BIM based Library, Korean Inst. Build. Inf. Model.,1(2), pp.12~18.
4
Hwang, H.S., Lee, J.H., Kim, T.Y. (2018) Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models, Korean Inst. Build. Inf. Model., 8(1), pp.56~62.
5
Jeon, G.H., Yun, S.H. (2011) The Case Study of BIM-based Quantity Take-off for Concrete and Formwork, J. KIBIM,1(1), pp.13~17.
6
Jung, G.Y., Woo, J.W., Kang, K.D., Shin, J.C. (2013) Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume, J. KIBIM, 3(3), pp.9~18. 10.13161/kibim.2013.3.3.009
7
Kim, C.W., Koo, B. (2014) Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings, J. Constr. Eng. & Manag., 15(4), pp.128~138. 10.6106/KJCEM.2014.15.4.128
8
Kim, J.M. (2016) BIM Based Smart Temporary Work Planning, 15, J. KIBIM, pp.38~39.
9
Korea Institute of Construction Technology (2007) Construction Information Classification System Manual.
10
Lee, H.J., Park, K.Y., Kim, H.J., Lee, S.H. (2010) BIM Based Virtual Simulations in CIP (Case in Place Pile) Method for Underground Space Excavation, In Proceedings of the Computational Structural Engineering Institute Conference,pp.517~520.
11
Ministry of Land, Infrastructure and Transport (2020a) BIM Activation Roadmap.
12
Ministry of Land, Infrastructure and Transport (2020b) Basic BIM Guidelines for Construction Industry.
13
National Center for construction Standards (2020) Standard for Temporary Construction.
14
Noh, H.R., Yun, S.H. (2016) A Study on the Expression Level of BIM Model for utilizing in Construction Phase, Korean Institute of Building Construction Conference,pp.253~254.
15
Oh, J.H., Cho, C.H., Kim, K.W., Baek, Y.S. (2002) Total Management System for Earth Retaining Structures Using Observational Method, J. Korean Geotech. Soc., 18(2), pp.51~64.
16
Park, J.K., Jung, K.Y. (2021) Accuracy Evaluation of Earthwork Volume Calculation According to Terrain Model Generation Method, J. Korean Soc. Surv., Geodesy, Photogramm. & Cartogr., 39(1), pp.47~54.
17
Public Procurement Service (2021) Standard Construction Code.
18
Shin, J.C., Baek, Y.I., Park, W.T. (2011) Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D, J. Korean Geotech. Soc., 27(8), pp.63~71. 10.7843/kgs.2011.27.8.063
19
Shin, S.H., Ham, N.H., Kim, J.J. (2010) Assessment of BIM- Based Government Funded Projects at the Design Phase, Korean Institute of Building Construction Conference, pp. 213~216.
Information
  • Publisher :Computational Structural Engineering Institute of Korea
  • Publisher(Ko) :한국전산구조공학회
  • Journal Title :Journal of the Computational Structural Engineering Institute of Korea
  • Journal Title(Ko) :한국전산구조공학회 논문집
  • Volume : 35
  • No :4
  • Pages :197-205
  • Received Date : 2022-04-07
  • Revised Date : 2022-06-23
  • Accepted Date : 2022-06-28
Journal Informaiton Journal of the Computational Structural Engineering Institute of Korea Journal of the Computational Structural Engineering Institute of Korea
  • NRF
  • KOFST
  • crossref crossmark
  • crossref cited-by
  • crosscheck
  • orcid
  • open access
  • ccl
Journal Informaiton Journal Informaiton - close